Kuala Langat - Malysia   

Combined cycle power plant with 6 gas turbines and 2 steam turbines.

I've been there twice. First from 1997-03-20 to 1997-04-03 and second from 1998-10-28 to 1998-11-12 for the upgrade of the gas turbine control systems.






Pictures